|
|
|
Rolling the Steam Drum after much annealing on the barbeque, the Mud Drums were rolled in the same way.
|
|
|
|
The Steam Drum set up on the Milling Machine for drilling.
|
|
|
|
The complete Boiler in the assembly jig ready for Brazing ( front view ).
|
|
|
|
The complete Boiler ( side view ).
|
|
|
|
Internal view of Steam Drum showing the riveted butt joint strap, the joints will be sealed with Silicon Bronze Braze as will the End Covers.
|
|
|